WANT ONE!!!!!!!! |
|
Without this one toll we would never have got this done. Its a cordless impact driver. We were loaned this one. We now want one, anyone got £350 |
|
|
|
|
|
|
|
|
|
|
ME outside |
|
Only briefly but Merddin was outside for a while today |
|
|
|
|
|
|
|
|
|
|
Tank 3 |
|
Tanks 3 and 4 will be stored for two years now so a thorough coat of paint is required |
|
|
|
|
|
|
|
|
|
|
Tank 3 |
|
The painting involved some lying down on the job |
|
|
|
|
|
|
|
|
|
|
Tank 3 |
|
More paint being applied |
|
|
|
|
|
|
|
|
|
|
Tank 3 |
|
Yet more paint. This is a proven rust preventing primer |
|
|
|
|
|
|
|
|
|
|
Tank 3 |
|
No point stressing yourself |
|
|
|
|
|
|
|
|
|
|
Tank 3 |
|
Once painted tank 3 was lifted into wagon 63 |
|
|
|
|
|
|
|
|
|
|
Tank 3 |
|
By sitting it on packings it sits in the wagon overhangine the ends slightly |
|
|
|
|
|
|
|
|
|
|
Tank 3 - Lifting |
|
The speader beam makes lifting these tanks really easy |
|
|
|
|
|
|
|
|
|
|
Tank 3 - trucked |
|
Thts it in the wagon. Tomorrow it will be joined by tank 4 and they will be lashed together. |
|
|
|
|
|
|
|
|
|
|
Tank 4 - Resting? |
|
Not really resting, PJ is under tank 4 to do some welding. |
|
|
|
|
|
|
|
|
|
|
Tank4 - Welding |
|
This is where the top of him is welding the top seam. |
|
|
|
|
|
|
|
|
|
|
Tank 4 - Welding |
|
A close up of PJ welding inside tank 4. |
|
|
|
|
|
|
|
|
|
|
Tank 4 - Base Plate |
|
The base is one of the last bits to be added. Here it is being tacked together. |
|
|
|
|
|
|
|
|
|
|
Tank 4- Tacking |
|
These are some of the last welds needed to the tank itself. Just the lifting beam to be assembled and then the lift can begin. |
|
|
|
|
|
|
|
|
|
|
Nearly Done |
|
The last bits are being done and the tank prepared for lifting. |
|
|
|
|
|
|
|
|
|
|
Lift Off |
|
Tank 4 leaves the jig |
|
|
|
|
|
|
|
|
|
|
Tank 4 - Upright |
|
That's it, the last one out of the jig at 18:04 on 03/01/04 |
|
|
|
|
|
|
|
|